DOUBLE TREE BY HILTON HOTEL

Construction Date: 2010-2011 Architects: Durmus DİLEKÇİ - Emir URAS Design Team: Fikret SUNGAY, Salih KÜÇÜKTUNA Handan AKBUDAK, Evren ALPAY, Aylin AYVAZ, Elvan DERVİŞOĞLU, Merve TOĞRU Location: Avcılar/İstanbul Construction Area: 25042 m2 Owner: Sonkar Otomativ A.Ş. Steel Contractor: Gülermak İnşaat Structure: Yapı Teknik Ltd. Şti.

 Structure is located on D-100 highway which is a significant route in Avcılar. Earthquake characteristics of the region forced us to use steel  
construction in this project. Project being the first in use of steel structure throughout the whole of the structure in high-rise buildings in Turkey has  
a simple formal characteristic in architectural point of view. While the horizontal mass contains functions required to be provided in horizontal plane,  vertical mass embraces the view in the direction of Marmara and Black Sea. Architectural and inner space allocation of the structure emphasizes the  structural system throughout the structure. Structure has a narrow façade in D-100 arterial road Istanbul or Edirne direction to prevent a massive structure in perspective and an extensive façade in the direction of the view for enabling an capacious view.
Sustainability is the most significant element in our choice of steel structure. Since the structure is light, less excavation and foundation depth was  required. Reproducibility of steel material from scrap helps preservation of our natural resources.
Use of timber is reduced as no formwork is required, thus significantly contributing to preservation of our forests. Since the use of concrete is minimal,  emission rate is reduced.
Double Tree By Hılton Hotel; Main tower bearing system is designed as steel construction starting from the ground level and basement levels are designed as a reinforced concrete  structure. Blocks located in the front and back of the tower are designed as reinforced concrete structures. Partial steel construction is preferred for  the blocks in the back. As steel manufacturing is mainly executed in workshop, construction quality is at top level. Only installation is executed on  
site, thus allowing maximum construction speed and contributing to start of operation of the facility in the shortest time period.
Solutions compliant with architecture in inner spaces as well as the façade and contributing to aesthetics are aimed in planning process of steel bearing  system.
Transverse systems, connection of columns to transverse elements and column-beam connections are executed with consideration of aesthetic values.
Horizontal loads of the structure (earthquake and wind) are supported by transver elements and vertical loads are supported by hd-type hipstar columns.  
Although cross-sections of HD-type columns are significantly large, area occupied by these elements are only in the dimension of 40 cm x 40 cm.
Minimal dimensions of the columns provide a spacious clearing and contribute positively to aesthetics.
 
Desing Compliant With Nakional and International Regulations
Steel tower is designed compliant to Turkish Earthquake Regulation, Eurocode 3-2005 (Design of Steel Structures), Eurocode 4 (Design of Composite Structures) and American Aısc-Asd89, Aısc 360-05/Ibc2006 codes. Furthermore, performance-based analysis of the tower is conducted.
Columns are composed of Hd-type S460 grade Histar sections.
Main beams and transverse elements consist of S355-grade sections.
secondary beams consist of S275-grade sections.
Beam-beam and column-beam connections are designed as bolted connections with high-strength 10-grade bolts.
All bolts used in connections are checked with torque meters. Torque meters are regularly calibrated with calibration device before each use.
Fire safety is provided with painting all sections with fire-resistant paint.
Welds in factory are executed as inert-gas welding and ultrasonic testing is performed. Furthermore, magnetic particle testing, penetrant testing, visual  inspection and non-destructive tests were executed.
Main beams and secondary beams are designed as composite elements with driving composite nails whilst making use of coating concrete which allowed  economical solutions.
Column joints are executed with full-penetration butt-welding on site. Kolon ekleri, şantiyede tam penetrasyonlu küt kaynak ile yapılmıştır. Beam-beam and  column-beam connections are designed as bolted connections with high-strength 10-grade bolts.
Çelik Yapılar - Sayı: 36 - Temmuz

Yarışma

Köprü Şenliği
PROSteel 2013'ün Ardından...
PROSteel 2013 BİRİNCİLİK ÖDÜLÜ
PROSteel 2013 İKİNCİLİK ÖDÜLÜ
PROSteel 2013 ÜÇÜNCÜLÜK ÖDÜLÜ
PROSteel 2013 BORUSAN MANNESMAN ÖZEL ÖDÜLÜ
PROSteel 2013 MANSİYON ÖDÜLLERİ
PROSteel 2013 MANSİYON ÖDÜLLERİ
PROSteel 2013 MANSİYON ÖDÜLLERİ
PROSteel 2013 MANSİYON ÖDÜLLERİ
PROSteel 2013 MANSİYON ÖDÜLLERİ
PROSteel 2013 MANSİYON ÖDÜLLERİ
Türkiye Çelik Yapı Tasarım Yarışması Sonuçlandı
Türkiye Çelik Yapı Tasarım Yarışması 2013 Birincilik Ödülü Projesi - Çelik Radar Kuleleri
Türkiye Çelik Yapı Tasarım Yarışması 2013 İkincilik Ödülü Projesi - ÇİMTAŞ Yönetim Binası
Türkiye Çelik Yapı Tasarım Yarışması 2013 Üçüncülük Ödülü Projesi - DOUBLE TREE BY HILTON HOTEL
Türkiye Çelik Yapı Tasarım Yarışması 2013 Projesi - Aqua Florya Alışveriş ve Yaşam Merkezi
Türkiye Çelik Yapı Tasarım Yarışması 2013 Projesi - Esenler Yeni Viyadüğü
Türkiye Çelik Yapı Tasarım Yarışması 2013 Projesi - VİALAND SHOWROOM BİNASI



© 2014 - Türk Yapısal Çelik Derneği